Heavy Excavation Fleet
Provided 15 CAT Excavators for foundation work on the iconic tower project.
Read Case StudyBrowse our comprehensive inventory of power generation equipment, engines, parts, and accessories.
11 main categories
Transfer switches change the supply to a load between power sources. A suitable specification depends on voltage, current, the number of poles, manual or automatic operation and coordination with the existing protection and control system.
Engine and generator parts are identified against the equipment model, serial number and part number where available. Send clear photographs and the required quantities to support compatibility checks; the exact specification, condition and supply terms are confirmed in the offer.
Custom packaging requirements define how generation equipment is arranged and integrated for a particular site. Available space, access, ventilation, exhaust routing, acoustic needs and service access should be reviewed together before the configuration and scope of supply are agreed.
Dual-fuel and bi-fuel enquiries require a review of the engine, proposed fuels, operating duty and site installation. Engine compatibility, fuel quality, controls and protection requirements must be established before a configuration or performance claim can be confirmed.
Data center power enquiries require clear load, continuity and integration requirements. Share the demand profile, voltage, expansion plans and existing electrical design so the proposed equipment and interfaces can be reviewed against the project specification.
Large power requirements need a coordinated assessment of the load profile, generation arrangement and electrical distribution. Share the project demand, location, voltage, operating duty and continuity requirements to support a project-specific technical and commercial review.
SKU: CAT-DG-250-C9
SKU: CAT-DG-500-C15
SKU: CAT-DG-800-C18
SKU: CAT-XQ2000
SKU: CAT-U-1000-15
See how our equipment and expertise have powered critical projects for leading organizations.
Provided 15 CAT Excavators for foundation work on the iconic tower project.
Read Case StudyComplete rebuilding of 4 Perkins marine engines for tugboats.
Read Case StudyDelivered and installed 2MW Cummins power units for remote mining sites.
Read Case StudySend us a message and we'll respond quickly
Haram ,Giza, Egypt
+201117785390
sales@power-badr.com
Sun - Thu: 9:00 AM - 6:00 PM
Emergency Support Available
Call NowOur team will contact you within 24 hours
We'll source it for you